navigationHome buttonAbout us buttonProduct listing buttonServicing buttonNews buttonContact us buttonnavigation
top curve design
 
 
 

Dubai Metro

    Hart Door Systems has won an export order so far for 155 multiple industrial roller shutters for Dubai Metro, United Arab Emirates, scheduled to be one of the most advanced urban rail systems in the world when it opens next year.  
 

The Hart contract was secured through the Al-Futtaim Group, who in turn have been awarded by Chadwick Technology Group.

Chadwick’s involvement in roofing & ceiling engineering and construction commenced in 1962 and at one stage for a considerable amount of time, was the largest sheet metal roofing contractor in Australia.

 
  Chadwick estimates that they have been involved in the installation of over 10 million m2 of metal deck roofing since 1988. Chadwick, through Chadwick Technology Pty Ltd have concentrated on the design engineering manufacture and installation of specialized composite roofing systems in either unique geometry or unique metals. Since 1988 Chadwick Technology has been involved in specialized roofing contracting in South East Asia and has undertaken major contracts in China, Hong Kong, Thailand, Malaysia, Singapore and more recently in the Middle East- Dubai    
  Chadwick has established corporate identities in Hong Kong, Thailand, Malaysia, Singapore and Dubai.  
  Alan Richardson, contract manager for Hart and in charge of exports, says the Dubai Metro will relieve congestion caused by increasing traffic as well supporting the continuing urban development needed to accommodate a population rising by 6.4% per annum and tourist numbers estimated to reach 15 million per annum by 2010, the year when the Dubai Metro will be fully operational.  
    “This is our largest export order to date and comes on the back of large orders for Hart products for Heathrow’s T5 and the international railway terminal at St. Pancras,” says Alan Richardson. “Time and time again we show that engineering excellence is still alive and well on Tyneside".  
  The first part of the order, which includes electrically operated security, insulated and fire roller shutters will be dispatched from the Hart’s factory starting in October and will be progressively delivered by September. The shutters are designed to work in very sophisticated and complex systems including depot protection when driver-less trains are in operation.  
         
   

Technical Information

 
   

Clients:

Al-Futtaim (FAMCO)
P.O. Box 5502, Dubai, UAE
Phone +971-4-2135248
Fax +971-4-2135548
www.famcouae.com

Chadwick Technology - Dubai
PO Box 78426
Dubai,UAE
Site Office Phone:
+971 4 204 5686
www.chadwicktechnology.com.au

Date: 2008/2009

 

Scope:

Manufacture 115 Insulated Roller Shutters, both fire rated and non-fire rated for the Jebel Ali and Rashidiya train depots.

 

 

Contacts:

Please contact Hart for any references.

 
               
               

 

News box top

 
News box bottom

Telephone: +44 (0) 191 214 0404

Accreditation Logos Inc. CE, LPCS, CHAS, FIRAS.
Box design bottom
© Hart Door Systems